Projects
Recent Projects
A sample of 100% FTM Concrete projects across Northwest Florida—showcasing the foundations, flatwork, and site solutions we bring to every job as we expand into the broader Gulf Coast.
Residential Development
Coastal Residences — Block Foundations & Slabs
This multi-lot coastal residential program required coordinated foundations, block stem walls, and structural slabs delivered on tight schedules. 100% FTM Concrete provided layout, formwork, reinforcement, and placement, ensuring each home pad met elevation, inspection, and schedule requirements.
- Block foundations, grade beams, and structural slabs
- Elevation-controlled pours for multiple residential lots
- Coordinated inspections and on-time turnover for builders
Commercial / Mixed-Use
Ten Lake Drive Development — Driveways & Structural Flatwork
For this mixed-use development, 100% FTM Concrete delivered driveway systems, parking pads, and structural flatwork designed to handle daily traffic and long-term wear. Our team managed subgrade prep, reinforcement, and precise finishing to keep the project on schedule and inspection-ready.
- Structural driveways, parking areas, and walkways
- Subgrade preparation, compaction, and reinforcement
- Inspection-ready finishes aligned with GC schedules
Federal / Public-Sector
Hurlburt Field Air Force Base — Site Concrete & Drainage
At Hurlburt Field AFB, 100% FTM Concrete supported critical site upgrades, including concrete pavements, drainage structures, and flatwork in active operational areas. Work was completed under strict safety, access, and quality control requirements.
- Site concrete, curbs, and heavy-use flatwork
- Integrated drainage and water-control structures
- Delivered under federal safety and access protocols
Additional Projects
Category: Commercial / Hospitality
30A Brewery Expansion — Driveway & Sidewalk Systems
As part of a hospitality expansion along Florida’s 30A corridor, 100% FTM Concrete delivered new pedestrian walkways, ADA-compliant sidewalks, and concrete drive lanes to support increased visitor traffic. Our team coordinated subgrade, formwork, and finishing to meet commercial safety and accessibility standards.
- ADA-compliant sidewalks, walkways, and pad placements
- Structural drive lanes designed for commercial vehicle load
- Clean, durable finishes aligned with brewery design requirements
Mixed-Use / Commercial
Mixed-Use Redevelopment — Structural Pads & Flatwork
This redevelopment project required precise concrete placements across multiple building types, including parking pads, utility-access slabs, and walkable surfaces. 100% FTM Concrete provided consistent onsite coordination, ensuring each placement met engineering specifications and passed all inspections on first review.
- Structural parking pads and reinforced utility-access slabs
- Coordinated flatwork across multi-building development zones
- Engineered finishes for long-term traffic and load performance
Commercial / Institutional
Corporate Headquarters Build — Foundations & Reinforced Slabs
For this headquarters development, 100% FTM Concrete delivered a full foundation package including footings, grade beams, and large-format structural slabs. Our team executed precision layout, steel reinforcement, and high-tolerance flatwork to support long-term structural integrity and interior build-out requirements.
- Foundation systems: footings, grade beams, and structural slabs
- High-tolerance interior flatwork for office and equipment spaces
- On-schedule delivery supporting GC’s commercial build timeline
Every Project Starts With a Strong Foundation
From coastal residences to federal facilities, 100% FTM Concrete delivers inspection-ready foundations, flatwork, and site solutions—on time, on grade, and built to last.
